NEC 220.83 vs. 220.87: Which Load Calculation for an Existing Home?

Both methods apply to existing dwellings and both are in the code. One models the house from nameplates, the other measures it. A worked example shows why the same 100-amp service can fail 220.83 and pass 220.87.

When you add load to an existing home, the NEC gives you two practical ways to show the service can take it. Both are legitimate. They routinely give different answers. (Section numbers and the worked example follow the 2020 and 2023 editions. The 2026 edition moves both sections to Article 120, as 120.83 and 120.87, and changes the traditional method itself. See "Under the 2026 edition" below.)

How 220.83 works

You total the home's "other loads":

Then you apply the demand factor: the first 8 kVA at 100 percent and the remainder at 40 percent.

If the job adds air conditioning or electric space heating, which includes a heat pump, the calculation switches to 220.83(B): that equipment is taken at 100 percent on top, and only the larger connected load of air conditioning or space heating is used, not both.

How 220.87 works

You obtain twelve months of maximum demand data, find the highest demand, multiply by 1.25, and add the new load. If the total fits within the service rating, you are done. The full requirements are in our guide to NEC 220.87.

The same house, both ways

An 1,800 sq ft home with a 100-amp, 240-volt service. Electric range, dryer and water heater. The owner wants to replace an old central AC with a cold-climate heat pump: 7.2 kVA (30 A), no resistance backup.

220.83

Load VA
General lighting, 1,800 sq ft at 3 VA 5,400
Two small-appliance circuits + laundry 4,500
Range 12,000
Dryer 5,000
Water heater 4,500
Dishwasher 1,200
Disposal 900
Total other loads 33,500
First 8,000 at 100% 8,000
Remaining 25,500 at 40% 10,200
New heat pump at 100% 7,200
Calculated load 25,400 VA = 106 A

106 amps on a 100-amp service. On paper, this job needs a service upgrade.

220.87

Step
Measured 12-month peak from the utility meter 9.7 kW
At 125% 12.1 kW
New heat pump 7.2 kW
Calculated load 19.3 kW = 81 A

81 amps on a 100-amp service. The job goes ahead, with about 19 amps to spare. If that peak happened on a summer afternoon, it even includes the old AC that is being removed, so the real margin is larger. Under the 2026 edition you can subtract the removed AC outright.

The 9.7 kW figure is not cherry-picked: it is the mean measured peak across 11,940 homes in Lawrence Berkeley National Laboratory's research, which found 220.87 results roughly 40 percent below 220.83 on average. Any individual home can be higher or lower, which is the whole point of measuring it.

Side by side

220.83 220.87
Input Square footage, circuits, nameplates 12 months of interval data from the meter
Site visit needed Yes, to inventory appliances Not for the existing load
Reflects occupant behavior No Yes
Safety margin Built into demand factors Explicit 125% on the measured peak
Works without usage history Yes Only through the 30-day recording exception
Typical result Higher Lower

Under the 2026 edition

The 2026 NEC renumbers the measured-demand method as 120.87 and lets you subtract any load being removed, with the new load determined under Article 120's calculation rules. The traditional method changes more. 120.83 drops the (A)/(B) split and uses one table:

The same house under 120.83:

Load VA
General lighting, 1,800 sq ft at 2 VA 3,600
Small-appliance, laundry and appliances as above 28,100
Total existing load 31,700
First 8,000 at 100% 8,000
Remaining 23,700 existing at 40% 9,480
New heat pump at 50% 3,600
Calculated load 21,080 VA = 88 A

Under 2026 the traditional method passes this job too, where the 2023 version failed it. Check which edition your jurisdiction enforces before you pick a method. Massachusetts, for example, has enforced the 2026 NEC since April 2026.

When 220.83 is still the right tool

When to reach for 220.87

In practice the two are not either/or. TrueLoad runs both from the same project: run the traditional calculation the day you open the job, and if it passes you are done. If it fails, request the customer's interval data and run measured demand in the same project, which is usually the lower number. When both have run, you pick which one the report is based on. How the two paths work together.


This guide paraphrases the code for explanation. Work from the NEC edition adopted in your jurisdiction, and remember the AHJ decides what is acceptable.