How to Get 12 Months of Interval Data From Your Utility

An NEC 220.87 load calculation needs a year of smart-meter interval data. Here is where to find it, what to ask the utility for, how to read the file, and the pitfalls that make an inspector push back.

A measured-demand load calculation under NEC 220.87 stands on one thing: a year of data showing what the service actually carried. For almost every home with a smart meter, that data already exists. The work is getting it out.

What you are asking for

Use these words with the utility, because the first person you reach may not know what a load calculation is:

Monthly bills and daily totals are not enough. The calculation needs the highest short-duration peak, and that is invisible in a monthly kWh figure.

Route 1: the customer downloads it

Most large utilities offer self-service download in the online account. Look under usage, energy use or "my data" for one of these labels:

This is the fastest route when it works: the homeowner can do it in five minutes and email you the file.

Route 2: the utility sends it

Smaller utilities, co-ops and municipals often have no download option but will release the data on request. The account holder has to authorize it. A request that works:

I am the account holder for [service address], account number [number]. I authorize [utility] to release my electric interval usage data (15-minute if available, otherwise hourly) for the most recent 12 months to [contractor name, email]. The data will be used for an electrical service load calculation under NEC 220.87. Please send it in CSV or Excel format.

Send it from the email address on the account, or have the customer call and then follow up in writing. Ask for the meter data or AMI group if customer service is unsure. TrueLoad generates this request for you from the project details, so the customer only has to approve it.

Utility-specific instructions: Green Mountain Power. More utilities are being added.

Route 3: no smart meter, or no data

If there is no interval meter, or the occupants have been there less than a year, 220.87 has an exception: record demand continuously for at least 30 days with a recording ammeter or power meter on the highest-loaded phase of the service, while the building is occupied, and account for the larger of the heating or cooling load and other seasonal loads. In the 2023 and 2026 editions that exception is not allowed where the service has a solar PV or wind system, or uses any form of peak load shaving. When this route is impractical, 220.83 is the fallback, and TrueLoad runs it from the same project, so the job does not wait on data.

Reading the file

Pitfalls

What TrueLoad does with it

Upload the CSV, Excel or XML file and TrueLoad reads the intervals, finds the peak, applies the 125 percent factor, adds the proposed equipment and produces a report for the AHJ. What inspectors want to see in that report is covered separately.

Put it into practice

TrueLoad runs the measured-demand calculation from the utility's interval data, or the traditional calculation when there is none, and produces the report. Your first project is free.